{"items":[{"ainglish":"Instruction: req: calibrate orbital spectrometer Nacre start-by(2026-10-31T16:00Z). Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z a console slot was reserved and the job was placed in the queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"spectrometer","english":"Instruction: Please begin genuine execution of calibrate orbital spectrometer Nacre at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z a console slot was reserved and the job was placed in the queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-acknowledged-only-spectrometer-00-0000","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-start-by-acknowledged-only-spectrometer"},{"ainglish":"Instruction: will: validate cold-chain crate Opal start-by(2026-10-31T16:00Z). Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z the crate number was acknowledged and assigned to the validation queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"cold-chain","english":"Instruction: I commit to begin genuine execution of validate cold-chain crate Opal at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z the crate number was acknowledged and assigned to the validation queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-acknowledged-only-cold-chain-01-0000","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-start-by-acknowledged-only-cold-chain"},{"ainglish":"Instruction: req: review the Sable disclosure for redactions start-by(2026-10-31T16:00Z). Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the disclosure was assigned to a reviewer and added to the review queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"redaction","english":"Instruction: Please begin genuine execution of review the Sable disclosure for redactions at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the disclosure was assigned to a reviewer and added to the review queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-acknowledged-only-redaction-02-0000","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No — the phase-qualified deadline obligation was violated.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-start-by-acknowledged-only-redaction"},{"ainglish":"Instruction: will: commission river gauge Topaz start-by(2026-10-31T16:00Z). Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z a field visit was scheduled and the gauge was entered on the commissioning list. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"river-gauge","english":"Instruction: I commit to begin genuine execution of commission river gauge Topaz at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z a field visit was scheduled and the gauge was entered on the commissioning list. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-acknowledged-only-river-gauge-03-0007","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","No — the phase-qualified deadline obligation was violated."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-start-by-acknowledged-only-river-gauge"},{"ainglish":"Instruction: req: certify sterility batch Vesper start-by(2026-10-31T16:00Z). Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the batch was logged and an incubator position was reserved. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"sterility","english":"Instruction: Please begin genuine execution of certify sterility batch Vesper at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the batch was logged and an incubator position was reserved. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-acknowledged-only-sterility-04-0000","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-start-by-acknowledged-only-sterility"},{"ainglish":"Instruction: will: rebuild dependency graph Wren start-by(2026-10-31T16:00Z). Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z a runner was reserved and the rebuild was queued for a future start. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"dependency-build","english":"Instruction: I commit to begin genuine execution of rebuild dependency graph Wren at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z a runner was reserved and the rebuild was queued for a future start. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-acknowledged-only-dependency-build-05-0001","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-start-by-acknowledged-only-dependency-build"},{"ainglish":"Instruction: req: inspect rail switch Yarrow start-by(2026-10-31T16:00Z). Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the switch was acknowledged on the work order and an inspection window was booked. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"rail-switch","english":"Instruction: Please begin genuine execution of inspect rail switch Yarrow at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the switch was acknowledged on the work order and an inspection window was booked. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-acknowledged-only-rail-switch-06-0000","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No — the phase-qualified deadline obligation was violated.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-start-by-acknowledged-only-rail-switch"},{"ainglish":"Instruction: will: process acoustic survey Zephyr start-by(2026-10-31T16:00Z). Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z the survey was registered and placed in the processing queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"acoustic-survey","english":"Instruction: I commit to begin genuine execution of process acoustic survey Zephyr at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z the survey was registered and placed in the processing queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-acknowledged-only-acoustic-survey-07-0001","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","No — the phase-qualified deadline obligation was violated."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-start-by-acknowledged-only-acoustic-survey"},{"ainglish":"Instruction: req: calibrate orbital spectrometer Nacre start-by(2026-10-31T16:00Z). Task record: At 15:34Z the first reference spectrum was captured. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all six reference bands passed the signed calibration tolerance.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"spectrometer","english":"Instruction: Please begin genuine execution of calibrate orbital spectrometer Nacre at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:34Z the first reference spectrum was captured. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all six reference bands passed the signed calibration tolerance.","force":"req","id":"SAT-DEADLINE-20260917-start-by-started-unfinished-spectrometer-00-0001","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-started-unfinished","state":"started-unfinished","world_id":"deadline-start-by-started-unfinished-spectrometer"},{"ainglish":"Instruction: will: validate cold-chain crate Opal start-by(2026-10-31T16:00Z). Task record: At 15:34Z the first temperature logger was read against the crate manifest. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z every logger passed the excursion check and the validation receipt was signed.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"cold-chain","english":"Instruction: I commit to begin genuine execution of validate cold-chain crate Opal at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:34Z the first temperature logger was read against the crate manifest. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z every logger passed the excursion check and the validation receipt was signed.","force":"will","id":"SAT-DEADLINE-20260917-start-by-started-unfinished-cold-chain-01-0000","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-started-unfinished","state":"started-unfinished","world_id":"deadline-start-by-started-unfinished-cold-chain"},{"ainglish":"Instruction: req: review the Sable disclosure for redactions start-by(2026-10-31T16:00Z). Task record: At 15:34Z the first page was checked against the sealed-name list. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z every page passed the redaction checklist and the release copy was signed.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"redaction","english":"Instruction: Please begin genuine execution of review the Sable disclosure for redactions at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:34Z the first page was checked against the sealed-name list. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z every page passed the redaction checklist and the release copy was signed.","force":"req","id":"SAT-DEADLINE-20260917-start-by-started-unfinished-redaction-02-0001","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","Yes — the phase-qualified deadline obligation was satisfied.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-started-unfinished","state":"started-unfinished","world_id":"deadline-start-by-started-unfinished-redaction"},{"ainglish":"Instruction: will: commission river gauge Topaz start-by(2026-10-31T16:00Z). Task record: At 15:34Z the first live level reading was compared with the surveyed datum. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z the gauge passed drift, telemetry, and datum checks and was accepted for service.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"river-gauge","english":"Instruction: I commit to begin genuine execution of commission river gauge Topaz at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:34Z the first live level reading was compared with the surveyed datum. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z the gauge passed drift, telemetry, and datum checks and was accepted for service.","force":"will","id":"SAT-DEADLINE-20260917-start-by-started-unfinished-river-gauge-03-0001","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","Yes — the phase-qualified deadline obligation was satisfied."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-started-unfinished","state":"started-unfinished","world_id":"deadline-start-by-started-unfinished-river-gauge"},{"ainglish":"Instruction: req: certify sterility batch Vesper start-by(2026-10-31T16:00Z). Task record: At 15:34Z the first sealed culture plate entered the prescribed incubation run. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all prescribed plates completed incubation without growth and the batch certificate was issued.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"sterility","english":"Instruction: Please begin genuine execution of certify sterility batch Vesper at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:34Z the first sealed culture plate entered the prescribed incubation run. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all prescribed plates completed incubation without growth and the batch certificate was issued.","force":"req","id":"SAT-DEADLINE-20260917-start-by-started-unfinished-sterility-04-0000","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-started-unfinished","state":"started-unfinished","world_id":"deadline-start-by-started-unfinished-sterility"},{"ainglish":"Instruction: will: rebuild dependency graph Wren start-by(2026-10-31T16:00Z). Task record: At 15:34Z the resolver began evaluating the first locked package against the new index. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z the complete graph resolved, rebuilt, and passed the pinned integrity check.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"dependency-build","english":"Instruction: I commit to begin genuine execution of rebuild dependency graph Wren at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:34Z the resolver began evaluating the first locked package against the new index. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z the complete graph resolved, rebuilt, and passed the pinned integrity check.","force":"will","id":"SAT-DEADLINE-20260917-start-by-started-unfinished-dependency-build-05-0000","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-started-unfinished","state":"started-unfinished","world_id":"deadline-start-by-started-unfinished-dependency-build"},{"ainglish":"Instruction: req: inspect rail switch Yarrow start-by(2026-10-31T16:00Z). Task record: At 15:34Z the first measured throw test was performed on the switch. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all throw, lock, and indication tests passed and the inspection was signed.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"rail-switch","english":"Instruction: Please begin genuine execution of inspect rail switch Yarrow at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:34Z the first measured throw test was performed on the switch. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all throw, lock, and indication tests passed and the inspection was signed.","force":"req","id":"SAT-DEADLINE-20260917-start-by-started-unfinished-rail-switch-06-0000","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","Yes — the phase-qualified deadline obligation was satisfied.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-started-unfinished","state":"started-unfinished","world_id":"deadline-start-by-started-unfinished-rail-switch"},{"ainglish":"Instruction: will: process acoustic survey Zephyr start-by(2026-10-31T16:00Z). Task record: At 15:34Z the first raw transect entered the calibrated filtering pipeline. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all transects passed quality control and the final survey product was accepted.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"acoustic-survey","english":"Instruction: I commit to begin genuine execution of process acoustic survey Zephyr at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:34Z the first raw transect entered the calibrated filtering pipeline. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all transects passed quality control and the final survey product was accepted.","force":"will","id":"SAT-DEADLINE-20260917-start-by-started-unfinished-acoustic-survey-07-0004","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","Yes — the phase-qualified deadline obligation was satisfied."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-started-unfinished","state":"started-unfinished","world_id":"deadline-start-by-started-unfinished-acoustic-survey"},{"ainglish":"Instruction: req: calibrate orbital spectrometer Nacre start-by(2026-10-31T16:00Z). Task record: At 15:12Z the first reference spectrum was captured. At 15:51Z all six reference bands passed the signed calibration tolerance. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"spectrometer","english":"Instruction: Please begin genuine execution of calibrate orbital spectrometer Nacre at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:12Z the first reference spectrum was captured. At 15:51Z all six reference bands passed the signed calibration tolerance. The successful state remained in force at 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-successful-spectrometer-00-0002","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-successful","state":"successful","world_id":"deadline-start-by-successful-spectrometer"},{"ainglish":"Instruction: will: validate cold-chain crate Opal start-by(2026-10-31T16:00Z). Task record: At 15:12Z the first temperature logger was read against the crate manifest. At 15:51Z every logger passed the excursion check and the validation receipt was signed. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"cold-chain","english":"Instruction: I commit to begin genuine execution of validate cold-chain crate Opal at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:12Z the first temperature logger was read against the crate manifest. At 15:51Z every logger passed the excursion check and the validation receipt was signed. The successful state remained in force at 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-successful-cold-chain-01-0000","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-successful","state":"successful","world_id":"deadline-start-by-successful-cold-chain"},{"ainglish":"Instruction: req: review the Sable disclosure for redactions start-by(2026-10-31T16:00Z). Task record: At 15:12Z the first page was checked against the sealed-name list. At 15:51Z every page passed the redaction checklist and the release copy was signed. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"redaction","english":"Instruction: Please begin genuine execution of review the Sable disclosure for redactions at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:12Z the first page was checked against the sealed-name list. At 15:51Z every page passed the redaction checklist and the release copy was signed. The successful state remained in force at 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-successful-redaction-02-0001","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","Yes — the phase-qualified deadline obligation was satisfied.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-successful","state":"successful","world_id":"deadline-start-by-successful-redaction"},{"ainglish":"Instruction: will: commission river gauge Topaz start-by(2026-10-31T16:00Z). Task record: At 15:12Z the first live level reading was compared with the surveyed datum. At 15:51Z the gauge passed drift, telemetry, and datum checks and was accepted for service. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"river-gauge","english":"Instruction: I commit to begin genuine execution of commission river gauge Topaz at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:12Z the first live level reading was compared with the surveyed datum. At 15:51Z the gauge passed drift, telemetry, and datum checks and was accepted for service. The successful state remained in force at 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-successful-river-gauge-03-0002","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","Yes — the phase-qualified deadline obligation was satisfied."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-successful","state":"successful","world_id":"deadline-start-by-successful-river-gauge"},{"ainglish":"Instruction: req: certify sterility batch Vesper start-by(2026-10-31T16:00Z). Task record: At 15:12Z the first sealed culture plate entered the prescribed incubation run. At 15:51Z all prescribed plates completed incubation without growth and the batch certificate was issued. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"sterility","english":"Instruction: Please begin genuine execution of certify sterility batch Vesper at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:12Z the first sealed culture plate entered the prescribed incubation run. At 15:51Z all prescribed plates completed incubation without growth and the batch certificate was issued. The successful state remained in force at 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-successful-sterility-04-0002","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-successful","state":"successful","world_id":"deadline-start-by-successful-sterility"},{"ainglish":"Instruction: will: rebuild dependency graph Wren start-by(2026-10-31T16:00Z). Task record: At 15:12Z the resolver began evaluating the first locked package against the new index. At 15:51Z the complete graph resolved, rebuilt, and passed the pinned integrity check. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"dependency-build","english":"Instruction: I commit to begin genuine execution of rebuild dependency graph Wren at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:12Z the resolver began evaluating the first locked package against the new index. At 15:51Z the complete graph resolved, rebuilt, and passed the pinned integrity check. The successful state remained in force at 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-successful-dependency-build-05-0001","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-successful","state":"successful","world_id":"deadline-start-by-successful-dependency-build"},{"ainglish":"Instruction: req: inspect rail switch Yarrow start-by(2026-10-31T16:00Z). Task record: At 15:12Z the first measured throw test was performed on the switch. At 15:51Z all throw, lock, and indication tests passed and the inspection was signed. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"rail-switch","english":"Instruction: Please begin genuine execution of inspect rail switch Yarrow at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:12Z the first measured throw test was performed on the switch. At 15:51Z all throw, lock, and indication tests passed and the inspection was signed. The successful state remained in force at 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-successful-rail-switch-06-0002","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","Yes — the phase-qualified deadline obligation was satisfied.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-successful","state":"successful","world_id":"deadline-start-by-successful-rail-switch"},{"ainglish":"Instruction: will: process acoustic survey Zephyr start-by(2026-10-31T16:00Z). Task record: At 15:12Z the first raw transect entered the calibrated filtering pipeline. At 15:51Z all transects passed quality control and the final survey product was accepted. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"acoustic-survey","english":"Instruction: I commit to begin genuine execution of process acoustic survey Zephyr at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:12Z the first raw transect entered the calibrated filtering pipeline. At 15:51Z all transects passed quality control and the final survey product was accepted. The successful state remained in force at 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-successful-acoustic-survey-07-0000","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","Yes — the phase-qualified deadline obligation was satisfied."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-successful","state":"successful","world_id":"deadline-start-by-successful-acoustic-survey"},{"ainglish":"Instruction: req: calibrate orbital spectrometer Nacre start-by(2026-10-31T16:00Z). Task record: At 15:26Z the first reference spectrum was captured. At 15:49Z the reference lamp failed and no calibration certificate was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"spectrometer","english":"Instruction: Please begin genuine execution of calibrate orbital spectrometer Nacre at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:26Z the first reference spectrum was captured. At 15:49Z the reference lamp failed and no calibration certificate was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-failed-spectrometer-00-0000","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-failed","state":"failed","world_id":"deadline-start-by-failed-spectrometer"},{"ainglish":"Instruction: will: validate cold-chain crate Opal start-by(2026-10-31T16:00Z). Task record: At 15:26Z the first temperature logger was read against the crate manifest. At 15:49Z one logger showed an unbounded gap and the crate failed validation. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"cold-chain","english":"Instruction: I commit to begin genuine execution of validate cold-chain crate Opal at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:26Z the first temperature logger was read against the crate manifest. At 15:49Z one logger showed an unbounded gap and the crate failed validation. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-failed-cold-chain-01-0002","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-failed","state":"failed","world_id":"deadline-start-by-failed-cold-chain"},{"ainglish":"Instruction: req: review the Sable disclosure for redactions start-by(2026-10-31T16:00Z). Task record: At 15:26Z the first page was checked against the sealed-name list. At 15:49Z the review stopped after an unrecoverable source-page mismatch and no release copy passed. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"redaction","english":"Instruction: Please begin genuine execution of review the Sable disclosure for redactions at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:26Z the first page was checked against the sealed-name list. At 15:49Z the review stopped after an unrecoverable source-page mismatch and no release copy passed. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-failed-redaction-02-0000","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","Yes — the phase-qualified deadline obligation was satisfied.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-failed","state":"failed","world_id":"deadline-start-by-failed-redaction"},{"ainglish":"Instruction: will: commission river gauge Topaz start-by(2026-10-31T16:00Z). Task record: At 15:26Z the first live level reading was compared with the surveyed datum. At 15:49Z the telemetry check failed and the gauge was not accepted for service. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"river-gauge","english":"Instruction: I commit to begin genuine execution of commission river gauge Topaz at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:26Z the first live level reading was compared with the surveyed datum. At 15:49Z the telemetry check failed and the gauge was not accepted for service. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-failed-river-gauge-03-0001","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","Yes — the phase-qualified deadline obligation was satisfied."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-failed","state":"failed","world_id":"deadline-start-by-failed-river-gauge"},{"ainglish":"Instruction: req: certify sterility batch Vesper start-by(2026-10-31T16:00Z). Task record: At 15:26Z the first sealed culture plate entered the prescribed incubation run. At 15:49Z a control plate invalidated the run and no sterility certificate was issued. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"sterility","english":"Instruction: Please begin genuine execution of certify sterility batch Vesper at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:26Z the first sealed culture plate entered the prescribed incubation run. At 15:49Z a control plate invalidated the run and no sterility certificate was issued. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-failed-sterility-04-0002","marker":"start-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-failed","state":"failed","world_id":"deadline-start-by-failed-sterility"},{"ainglish":"Instruction: will: rebuild dependency graph Wren start-by(2026-10-31T16:00Z). Task record: At 15:26Z the resolver began evaluating the first locked package against the new index. At 15:49Z resolution terminated on an unsatisfied checksum and no valid graph was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"dependency-build","english":"Instruction: I commit to begin genuine execution of rebuild dependency graph Wren at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:26Z the resolver began evaluating the first locked package against the new index. At 15:49Z resolution terminated on an unsatisfied checksum and no valid graph was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-failed-dependency-build-05-0001","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-failed","state":"failed","world_id":"deadline-start-by-failed-dependency-build"},{"ainglish":"Instruction: req: inspect rail switch Yarrow start-by(2026-10-31T16:00Z). Task record: At 15:26Z the first measured throw test was performed on the switch. At 15:49Z the lock test failed and the switch did not receive a passing inspection. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"rail-switch","english":"Instruction: Please begin genuine execution of inspect rail switch Yarrow at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:26Z the first measured throw test was performed on the switch. At 15:49Z the lock test failed and the switch did not receive a passing inspection. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-start-by-failed-rail-switch-06-0002","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","Yes — the phase-qualified deadline obligation was satisfied.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-failed","state":"failed","world_id":"deadline-start-by-failed-rail-switch"},{"ainglish":"Instruction: will: process acoustic survey Zephyr start-by(2026-10-31T16:00Z). Task record: At 15:26Z the first raw transect entered the calibrated filtering pipeline. At 15:49Z the navigation channel was corrupt and no accepted survey product was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"acoustic-survey","english":"Instruction: I commit to begin genuine execution of process acoustic survey Zephyr at or before 2026-10-31T16:00Z. Acknowledging, queueing, reserving capacity, or scheduling a later start does not satisfy this deadline; successful completion is not required by that instant. Task record: At 15:26Z the first raw transect entered the calibrated filtering pipeline. At 15:49Z the navigation channel was corrupt and no accepted survey product was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-start-by-failed-acoustic-survey-07-0001","marker":"start-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","Yes — the phase-qualified deadline obligation was satisfied."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"start-by-failed","state":"failed","world_id":"deadline-start-by-failed-acoustic-survey"},{"ainglish":"Instruction: req: calibrate orbital spectrometer Nacre complete-by(2026-10-31T16:00Z). Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z a console slot was reserved and the job was placed in the queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"spectrometer","english":"Instruction: Please ensure that the declared successful-completion condition for calibrate orbital spectrometer Nacre is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z a console slot was reserved and the job was placed in the queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-acknowledged-only-spectrometer-00-0004","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-complete-by-acknowledged-only-spectrometer"},{"ainglish":"Instruction: will: validate cold-chain crate Opal complete-by(2026-10-31T16:00Z). Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z the crate number was acknowledged and assigned to the validation queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"cold-chain","english":"Instruction: I commit to ensure that the declared successful-completion condition for validate cold-chain crate Opal is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z the crate number was acknowledged and assigned to the validation queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-acknowledged-only-cold-chain-01-0001","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-complete-by-acknowledged-only-cold-chain"},{"ainglish":"Instruction: req: review the Sable disclosure for redactions complete-by(2026-10-31T16:00Z). Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the disclosure was assigned to a reviewer and added to the review queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"redaction","english":"Instruction: Please ensure that the declared successful-completion condition for review the Sable disclosure for redactions is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the disclosure was assigned to a reviewer and added to the review queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-acknowledged-only-redaction-02-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No — the phase-qualified deadline obligation was violated.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-complete-by-acknowledged-only-redaction"},{"ainglish":"Instruction: will: commission river gauge Topaz complete-by(2026-10-31T16:00Z). Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z a field visit was scheduled and the gauge was entered on the commissioning list. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"river-gauge","english":"Instruction: I commit to ensure that the declared successful-completion condition for commission river gauge Topaz is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z a field visit was scheduled and the gauge was entered on the commissioning list. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-acknowledged-only-river-gauge-03-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","No — the phase-qualified deadline obligation was violated."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-complete-by-acknowledged-only-river-gauge"},{"ainglish":"Instruction: req: certify sterility batch Vesper complete-by(2026-10-31T16:00Z). Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the batch was logged and an incubator position was reserved. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"sterility","english":"Instruction: Please ensure that the declared successful-completion condition for certify sterility batch Vesper is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the batch was logged and an incubator position was reserved. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-acknowledged-only-sterility-04-0000","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-complete-by-acknowledged-only-sterility"},{"ainglish":"Instruction: will: rebuild dependency graph Wren complete-by(2026-10-31T16:00Z). Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z a runner was reserved and the rebuild was queued for a future start. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"dependency-build","english":"Instruction: I commit to ensure that the declared successful-completion condition for rebuild dependency graph Wren is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z a runner was reserved and the rebuild was queued for a future start. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-acknowledged-only-dependency-build-05-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-complete-by-acknowledged-only-dependency-build"},{"ainglish":"Instruction: req: inspect rail switch Yarrow complete-by(2026-10-31T16:00Z). Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the switch was acknowledged on the work order and an inspection window was booked. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"rail-switch","english":"Instruction: Please ensure that the declared successful-completion condition for inspect rail switch Yarrow is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:05Z the assignee acknowledged the task; at 15:20Z the switch was acknowledged on the work order and an inspection window was booked. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-acknowledged-only-rail-switch-06-0001","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No — the phase-qualified deadline obligation was violated.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-complete-by-acknowledged-only-rail-switch"},{"ainglish":"Instruction: will: process acoustic survey Zephyr complete-by(2026-10-31T16:00Z). Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z the survey was registered and placed in the processing queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"acoustic-survey","english":"Instruction: I commit to ensure that the declared successful-completion condition for process acoustic survey Zephyr is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:05Z the speaker acknowledged the task; at 15:20Z the survey was registered and placed in the processing queue. No task-specific execution step occurred before 16:00Z. Actual execution began at 16:24Z, and the success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-acknowledged-only-acoustic-survey-07-0003","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","No — the phase-qualified deadline obligation was violated."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-acknowledged-only","state":"acknowledged-only","world_id":"deadline-complete-by-acknowledged-only-acoustic-survey"},{"ainglish":"Instruction: req: calibrate orbital spectrometer Nacre complete-by(2026-10-31T16:00Z). Task record: At 15:34Z the first reference spectrum was captured. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all six reference bands passed the signed calibration tolerance.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"spectrometer","english":"Instruction: Please ensure that the declared successful-completion condition for calibrate orbital spectrometer Nacre is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:34Z the first reference spectrum was captured. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all six reference bands passed the signed calibration tolerance.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-started-unfinished-spectrometer-00-0002","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-started-unfinished","state":"started-unfinished","world_id":"deadline-complete-by-started-unfinished-spectrometer"},{"ainglish":"Instruction: will: validate cold-chain crate Opal complete-by(2026-10-31T16:00Z). Task record: At 15:34Z the first temperature logger was read against the crate manifest. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z every logger passed the excursion check and the validation receipt was signed.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"cold-chain","english":"Instruction: I commit to ensure that the declared successful-completion condition for validate cold-chain crate Opal is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:34Z the first temperature logger was read against the crate manifest. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z every logger passed the excursion check and the validation receipt was signed.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-started-unfinished-cold-chain-01-0001","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-started-unfinished","state":"started-unfinished","world_id":"deadline-complete-by-started-unfinished-cold-chain"},{"ainglish":"Instruction: req: review the Sable disclosure for redactions complete-by(2026-10-31T16:00Z). Task record: At 15:34Z the first page was checked against the sealed-name list. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z every page passed the redaction checklist and the release copy was signed.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"redaction","english":"Instruction: Please ensure that the declared successful-completion condition for review the Sable disclosure for redactions is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:34Z the first page was checked against the sealed-name list. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z every page passed the redaction checklist and the release copy was signed.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-started-unfinished-redaction-02-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No — the phase-qualified deadline obligation was violated.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-started-unfinished","state":"started-unfinished","world_id":"deadline-complete-by-started-unfinished-redaction"},{"ainglish":"Instruction: will: commission river gauge Topaz complete-by(2026-10-31T16:00Z). Task record: At 15:34Z the first live level reading was compared with the surveyed datum. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z the gauge passed drift, telemetry, and datum checks and was accepted for service.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"river-gauge","english":"Instruction: I commit to ensure that the declared successful-completion condition for commission river gauge Topaz is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:34Z the first live level reading was compared with the surveyed datum. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z the gauge passed drift, telemetry, and datum checks and was accepted for service.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-started-unfinished-river-gauge-03-0002","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","No — the phase-qualified deadline obligation was violated."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-started-unfinished","state":"started-unfinished","world_id":"deadline-complete-by-started-unfinished-river-gauge"},{"ainglish":"Instruction: req: certify sterility batch Vesper complete-by(2026-10-31T16:00Z). Task record: At 15:34Z the first sealed culture plate entered the prescribed incubation run. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all prescribed plates completed incubation without growth and the batch certificate was issued.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"sterility","english":"Instruction: Please ensure that the declared successful-completion condition for certify sterility batch Vesper is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:34Z the first sealed culture plate entered the prescribed incubation run. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all prescribed plates completed incubation without growth and the batch certificate was issued.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-started-unfinished-sterility-04-0001","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-started-unfinished","state":"started-unfinished","world_id":"deadline-complete-by-started-unfinished-sterility"},{"ainglish":"Instruction: will: rebuild dependency graph Wren complete-by(2026-10-31T16:00Z). Task record: At 15:34Z the resolver began evaluating the first locked package against the new index. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z the complete graph resolved, rebuilt, and passed the pinned integrity check.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"dependency-build","english":"Instruction: I commit to ensure that the declared successful-completion condition for rebuild dependency graph Wren is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:34Z the resolver began evaluating the first locked package against the new index. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z the complete graph resolved, rebuilt, and passed the pinned integrity check.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-started-unfinished-dependency-build-05-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-started-unfinished","state":"started-unfinished","world_id":"deadline-complete-by-started-unfinished-dependency-build"},{"ainglish":"Instruction: req: inspect rail switch Yarrow complete-by(2026-10-31T16:00Z). Task record: At 15:34Z the first measured throw test was performed on the switch. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all throw, lock, and indication tests passed and the inspection was signed.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"rail-switch","english":"Instruction: Please ensure that the declared successful-completion condition for inspect rail switch Yarrow is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:34Z the first measured throw test was performed on the switch. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all throw, lock, and indication tests passed and the inspection was signed.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-started-unfinished-rail-switch-06-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No — the phase-qualified deadline obligation was violated.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-started-unfinished","state":"started-unfinished","world_id":"deadline-complete-by-started-unfinished-rail-switch"},{"ainglish":"Instruction: will: process acoustic survey Zephyr complete-by(2026-10-31T16:00Z). Task record: At 15:34Z the first raw transect entered the calibrated filtering pipeline. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all transects passed quality control and the final survey product was accepted.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"acoustic-survey","english":"Instruction: I commit to ensure that the declared successful-completion condition for process acoustic survey Zephyr is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:34Z the first raw transect entered the calibrated filtering pipeline. At 16:00Z execution was genuinely under way but unfinished. At 16:41Z all transects passed quality control and the final survey product was accepted.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-started-unfinished-acoustic-survey-07-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","No — the phase-qualified deadline obligation was violated."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-started-unfinished","state":"started-unfinished","world_id":"deadline-complete-by-started-unfinished-acoustic-survey"},{"ainglish":"Instruction: req: calibrate orbital spectrometer Nacre complete-by(2026-10-31T16:00Z). Task record: At 15:12Z the first reference spectrum was captured. At 15:51Z all six reference bands passed the signed calibration tolerance. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"spectrometer","english":"Instruction: Please ensure that the declared successful-completion condition for calibrate orbital spectrometer Nacre is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:12Z the first reference spectrum was captured. At 15:51Z all six reference bands passed the signed calibration tolerance. The successful state remained in force at 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-successful-spectrometer-00-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-successful","state":"successful","world_id":"deadline-complete-by-successful-spectrometer"},{"ainglish":"Instruction: will: validate cold-chain crate Opal complete-by(2026-10-31T16:00Z). Task record: At 15:12Z the first temperature logger was read against the crate manifest. At 15:51Z every logger passed the excursion check and the validation receipt was signed. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"cold-chain","english":"Instruction: I commit to ensure that the declared successful-completion condition for validate cold-chain crate Opal is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:12Z the first temperature logger was read against the crate manifest. At 15:51Z every logger passed the excursion check and the validation receipt was signed. The successful state remained in force at 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-successful-cold-chain-01-0000","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-successful","state":"successful","world_id":"deadline-complete-by-successful-cold-chain"},{"ainglish":"Instruction: req: review the Sable disclosure for redactions complete-by(2026-10-31T16:00Z). Task record: At 15:12Z the first page was checked against the sealed-name list. At 15:51Z every page passed the redaction checklist and the release copy was signed. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"redaction","english":"Instruction: Please ensure that the declared successful-completion condition for review the Sable disclosure for redactions is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:12Z the first page was checked against the sealed-name list. At 15:51Z every page passed the redaction checklist and the release copy was signed. The successful state remained in force at 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-successful-redaction-02-0004","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","Yes — the phase-qualified deadline obligation was satisfied.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-successful","state":"successful","world_id":"deadline-complete-by-successful-redaction"},{"ainglish":"Instruction: will: commission river gauge Topaz complete-by(2026-10-31T16:00Z). Task record: At 15:12Z the first live level reading was compared with the surveyed datum. At 15:51Z the gauge passed drift, telemetry, and datum checks and was accepted for service. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"river-gauge","english":"Instruction: I commit to ensure that the declared successful-completion condition for commission river gauge Topaz is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:12Z the first live level reading was compared with the surveyed datum. At 15:51Z the gauge passed drift, telemetry, and datum checks and was accepted for service. The successful state remained in force at 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-successful-river-gauge-03-0001","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","Yes — the phase-qualified deadline obligation was satisfied."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-successful","state":"successful","world_id":"deadline-complete-by-successful-river-gauge"},{"ainglish":"Instruction: req: certify sterility batch Vesper complete-by(2026-10-31T16:00Z). Task record: At 15:12Z the first sealed culture plate entered the prescribed incubation run. At 15:51Z all prescribed plates completed incubation without growth and the batch certificate was issued. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"sterility","english":"Instruction: Please ensure that the declared successful-completion condition for certify sterility batch Vesper is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:12Z the first sealed culture plate entered the prescribed incubation run. At 15:51Z all prescribed plates completed incubation without growth and the batch certificate was issued. The successful state remained in force at 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-successful-sterility-04-0002","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-successful","state":"successful","world_id":"deadline-complete-by-successful-sterility"},{"ainglish":"Instruction: will: rebuild dependency graph Wren complete-by(2026-10-31T16:00Z). Task record: At 15:12Z the resolver began evaluating the first locked package against the new index. At 15:51Z the complete graph resolved, rebuilt, and passed the pinned integrity check. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"dependency-build","english":"Instruction: I commit to ensure that the declared successful-completion condition for rebuild dependency graph Wren is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:12Z the resolver began evaluating the first locked package against the new index. At 15:51Z the complete graph resolved, rebuilt, and passed the pinned integrity check. The successful state remained in force at 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-successful-dependency-build-05-0002","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-successful","state":"successful","world_id":"deadline-complete-by-successful-dependency-build"},{"ainglish":"Instruction: req: inspect rail switch Yarrow complete-by(2026-10-31T16:00Z). Task record: At 15:12Z the first measured throw test was performed on the switch. At 15:51Z all throw, lock, and indication tests passed and the inspection was signed. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"rail-switch","english":"Instruction: Please ensure that the declared successful-completion condition for inspect rail switch Yarrow is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:12Z the first measured throw test was performed on the switch. At 15:51Z all throw, lock, and indication tests passed and the inspection was signed. The successful state remained in force at 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-successful-rail-switch-06-0001","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","Yes — the phase-qualified deadline obligation was satisfied.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-successful","state":"successful","world_id":"deadline-complete-by-successful-rail-switch"},{"ainglish":"Instruction: will: process acoustic survey Zephyr complete-by(2026-10-31T16:00Z). Task record: At 15:12Z the first raw transect entered the calibrated filtering pipeline. At 15:51Z all transects passed quality control and the final survey product was accepted. The successful state remained in force at 16:00Z.","answer":"Yes — the phase-qualified deadline obligation was satisfied.","domain":"acoustic-survey","english":"Instruction: I commit to ensure that the declared successful-completion condition for process acoustic survey Zephyr is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:12Z the first raw transect entered the calibrated filtering pipeline. At 15:51Z all transects passed quality control and the final survey product was accepted. The successful state remained in force at 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-successful-acoustic-survey-07-0000","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","Yes — the phase-qualified deadline obligation was satisfied."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-successful","state":"successful","world_id":"deadline-complete-by-successful-acoustic-survey"},{"ainglish":"Instruction: req: calibrate orbital spectrometer Nacre complete-by(2026-10-31T16:00Z). Task record: At 15:26Z the first reference spectrum was captured. At 15:49Z the reference lamp failed and no calibration certificate was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"spectrometer","english":"Instruction: Please ensure that the declared successful-completion condition for calibrate orbital spectrometer Nacre is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:26Z the first reference spectrum was captured. At 15:49Z the reference lamp failed and no calibration certificate was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-failed-spectrometer-00-0002","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-failed","state":"failed","world_id":"deadline-complete-by-failed-spectrometer"},{"ainglish":"Instruction: will: validate cold-chain crate Opal complete-by(2026-10-31T16:00Z). Task record: At 15:26Z the first temperature logger was read against the crate manifest. At 15:49Z one logger showed an unbounded gap and the crate failed validation. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"cold-chain","english":"Instruction: I commit to ensure that the declared successful-completion condition for validate cold-chain crate Opal is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:26Z the first temperature logger was read against the crate manifest. At 15:49Z one logger showed an unbounded gap and the crate failed validation. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-failed-cold-chain-01-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-failed","state":"failed","world_id":"deadline-complete-by-failed-cold-chain"},{"ainglish":"Instruction: req: review the Sable disclosure for redactions complete-by(2026-10-31T16:00Z). Task record: At 15:26Z the first page was checked against the sealed-name list. At 15:49Z the review stopped after an unrecoverable source-page mismatch and no release copy passed. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"redaction","english":"Instruction: Please ensure that the declared successful-completion condition for review the Sable disclosure for redactions is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:26Z the first page was checked against the sealed-name list. At 15:49Z the review stopped after an unrecoverable source-page mismatch and no release copy passed. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-failed-redaction-02-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No — the phase-qualified deadline obligation was violated.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-failed","state":"failed","world_id":"deadline-complete-by-failed-redaction"},{"ainglish":"Instruction: will: commission river gauge Topaz complete-by(2026-10-31T16:00Z). Task record: At 15:26Z the first live level reading was compared with the surveyed datum. At 15:49Z the telemetry check failed and the gauge was not accepted for service. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"river-gauge","english":"Instruction: I commit to ensure that the declared successful-completion condition for commission river gauge Topaz is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:26Z the first live level reading was compared with the surveyed datum. At 15:49Z the telemetry check failed and the gauge was not accepted for service. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-failed-river-gauge-03-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","No — the phase-qualified deadline obligation was violated."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-failed","state":"failed","world_id":"deadline-complete-by-failed-river-gauge"},{"ainglish":"Instruction: req: certify sterility batch Vesper complete-by(2026-10-31T16:00Z). Task record: At 15:26Z the first sealed culture plate entered the prescribed incubation run. At 15:49Z a control plate invalidated the run and no sterility certificate was issued. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"sterility","english":"Instruction: Please ensure that the declared successful-completion condition for certify sterility batch Vesper is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:26Z the first sealed culture plate entered the prescribed incubation run. At 15:49Z a control plate invalidated the run and no sterility certificate was issued. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-failed-sterility-04-0000","marker":"complete-by","options":["No — the phase-qualified deadline obligation was violated.","Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-failed","state":"failed","world_id":"deadline-complete-by-failed-sterility"},{"ainglish":"Instruction: will: rebuild dependency graph Wren complete-by(2026-10-31T16:00Z). Task record: At 15:26Z the resolver began evaluating the first locked package against the new index. At 15:49Z resolution terminated on an unsatisfied checksum and no valid graph was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"dependency-build","english":"Instruction: I commit to ensure that the declared successful-completion condition for rebuild dependency graph Wren is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:26Z the resolver began evaluating the first locked package against the new index. At 15:49Z resolution terminated on an unsatisfied checksum and no valid graph was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-failed-dependency-build-05-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","No — the phase-qualified deadline obligation was violated.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-failed","state":"failed","world_id":"deadline-complete-by-failed-dependency-build"},{"ainglish":"Instruction: req: inspect rail switch Yarrow complete-by(2026-10-31T16:00Z). Task record: At 15:26Z the first measured throw test was performed on the switch. At 15:49Z the lock test failed and the switch did not receive a passing inspection. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"rail-switch","english":"Instruction: Please ensure that the declared successful-completion condition for inspect rail switch Yarrow is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:26Z the first measured throw test was performed on the switch. At 15:49Z the lock test failed and the switch did not receive a passing inspection. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"req","id":"SAT-DEADLINE-20260917-complete-by-failed-rail-switch-06-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No — the phase-qualified deadline obligation was violated.","No deadline obligation exists in the instruction."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-failed","state":"failed","world_id":"deadline-complete-by-failed-rail-switch"},{"ainglish":"Instruction: will: process acoustic survey Zephyr complete-by(2026-10-31T16:00Z). Task record: At 15:26Z the first raw transect entered the calibrated filtering pipeline. At 15:49Z the navigation channel was corrupt and no accepted survey product was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","answer":"No — the phase-qualified deadline obligation was violated.","domain":"acoustic-survey","english":"Instruction: I commit to ensure that the declared successful-completion condition for process acoustic survey Zephyr is satisfied at or before 2026-10-31T16:00Z. Merely stopping, timing out, cancellation, or terminal failure does not satisfy this deadline; no separate earliest-start constraint is stated. Task record: At 15:26Z the first raw transect entered the calibrated filtering pipeline. At 15:49Z the navigation channel was corrupt and no accepted survey product was produced. Work had genuinely begun, but the declared success condition was not satisfied by 16:00Z.","force":"will","id":"SAT-DEADLINE-20260917-complete-by-failed-acoustic-survey-07-0000","marker":"complete-by","options":["Yes — the phase-qualified deadline obligation was satisfied.","Cannot determine because the instruction supplies no deadline instant.","No deadline obligation exists in the instruction.","No — the phase-qualified deadline obligation was violated."],"oracle_boundary":"start-by is satisfied by genuine task execution beginning at or before the inclusive deadline, even if work is unfinished or later fails; acknowledgement or queueing alone is insufficient. complete-by is satisfied only when the declared success condition holds by the deadline; starting, stopping, or failing is insufficient.","question":"At 2026-10-31T16:00Z, was the instruction's stated deadline obligation satisfied?","settlement_stratum":"complete-by-failed","state":"failed","world_id":"deadline-complete-by-failed-acoustic-survey"},{"ainglish":"The custodian of locker K-8300 is Asha.","answer":"Asha","calibration":true,"calibration_construct":"resolved locker custodian","calibration_scope":"target-independent","english":"The custodian of locker K-8300 is not recorded.","id":"SAT-DEADLINE-cal-00","options":["Asha","Bram","Cleo","Davi","not determined"],"question":"Who is the custodian of locker K-8300?"},{"ainglish":"The custodian of locker K-8301 is Bram.","answer":"Bram","calibration":true,"calibration_construct":"resolved locker custodian","calibration_scope":"target-independent","english":"The custodian of locker K-8301 is not recorded.","id":"SAT-DEADLINE-cal-01","options":["Asha","Bram","Cleo","Davi","not determined"],"question":"Who is the custodian of locker K-8301?"},{"ainglish":"The custodian of locker K-8302 is Cleo.","answer":"Cleo","calibration":true,"calibration_construct":"resolved locker custodian","calibration_scope":"target-independent","english":"The custodian of locker K-8302 is not recorded.","id":"SAT-DEADLINE-cal-02","options":["Asha","Bram","Cleo","Davi","not determined"],"question":"Who is the custodian of locker K-8302?"},{"ainglish":"The custodian of locker K-8303 is Davi.","answer":"Davi","calibration":true,"calibration_construct":"resolved locker custodian","calibration_scope":"target-independent","english":"The custodian of locker K-8303 is not recorded.","id":"SAT-DEADLINE-cal-03","options":["Asha","Bram","Cleo","Davi","not determined"],"question":"Who is the custodian of locker K-8303?"},{"ainglish":"The custodian of locker K-8304 is Asha.","answer":"Asha","calibration":true,"calibration_construct":"resolved locker custodian","calibration_scope":"target-independent","english":"The custodian of locker K-8304 is not recorded.","id":"SAT-DEADLINE-cal-04","options":["Asha","Bram","Cleo","Davi","not determined"],"question":"Who is the custodian of locker K-8304?"},{"ainglish":"The custodian of locker K-8305 is Bram.","answer":"Bram","calibration":true,"calibration_construct":"resolved locker custodian","calibration_scope":"target-independent","english":"The custodian of locker K-8305 is not recorded.","id":"SAT-DEADLINE-cal-05","options":["Asha","Bram","Cleo","Davi","not determined"],"question":"Who is the custodian of locker K-8305?"},{"ainglish":"The custodian of locker K-8306 is Cleo.","answer":"Cleo","calibration":true,"calibration_construct":"resolved locker custodian","calibration_scope":"target-independent","english":"The custodian of locker K-8306 is not recorded.","id":"SAT-DEADLINE-cal-06","options":["Asha","Bram","Cleo","Davi","not determined"],"question":"Who is the custodian of locker K-8306?"},{"ainglish":"The custodian of locker K-8307 is Davi.","answer":"Davi","calibration":true,"calibration_construct":"resolved locker custodian","calibration_scope":"target-independent","english":"The custodian of locker K-8307 is not recorded.","id":"SAT-DEADLINE-cal-07","options":["Asha","Bram","Cleo","Davi","not determined"],"question":"Who is the custodian of locker K-8307?"}],"kind":"saturnia.ainglish.start-complete-comprehension-items.v1","sha256":"a22e69be15d32c4f389a65d6a024c064c7429df5c6e5e2b2ea7253eb24b9f9cd"}